The people behind our sustainable work
Engineers, analysts and coordinators who plan, measure and deliver practical steps toward a lower-carbon future.
Programme leadership
Our leads set priorities, agree targets with partners and keep every project tied to measurable emissions results.
Programme Director
Responsible for the overall direction of our sustainability programme, from setting annual reduction goals to reporting progress to clients and public bodies.
Before joining, the role covered energy policy and public consultation, so the work always starts with the question of what a decision will change on the ground.
Engineering and carbon accounting
The technical core of the team turns building, transport and supply data into figures that can be checked and repeated.
Lead Engineer, Energy Systems
Designs efficiency upgrades and on-site generation plans, and checks that installed systems perform as modelled after handover.
Works closely with facilities managers so that proposals fit real operating schedules and budgets.
How the team works
- Every role has a named counterpart on client projects, so questions have a clear owner.
- Emissions figures are recalculated each quarter using the same method.
- Site visits are scheduled before any recommendation is written.
- Findings are shared in plain language alongside the technical report.
From brief to delivery
Each project passes through the same stages, and different team members lead different stages.
Stage 1
Site and data review
The analysts gather utility bills, floor plans and operating hours to build a baseline.
Stage 2
Options and costs
Engineers model practical measures and compare their savings against capital cost.
Stage 3
Installation and checks
Coordinators supervise works and confirm that results match the agreed design.
In the field
Working with the team
Who should I contact first?
Send your question to the programme office. It will be passed to the role best placed to answer it.
Can the team support an existing project?
Yes. We review current plans, check the data behind them and suggest changes that can be made without restarting the work.